• Industry Control Electrical Power Toroidal Transformer
  • Industry Control Electrical Power Toroidal Transformer
  • Industry Control Electrical Power Toroidal Transformer
  • Industry Control Electrical Power Toroidal Transformer
  • Industry Control Electrical Power Toroidal Transformer
  • Industry Control Electrical Power Toroidal Transformer

Industry Control Electrical Power Toroidal Transformer

Application: Power, Electronic, Audio, Industry Control
Phase: Single
Core: Toroidal
Cooling Method: Dry-type Transformer
Winding Type: Auto-transformer
Certification: ISO9001-2000, UL, ISO9001, CE
Samples:
US$ 15/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
AL-TT14
Usage
Single-phase Transformer, Power Transformer
Frequency Characteristics
Low Frequency
Shape of Core
Ring
Brand
AL TRANSFO
Winding Material
Copper100%
Efficiency
>92%
Coil Number
Double Winding and Multi-Wind
Features
Lower Porfile and Weight
Core Material
Silicon Steel Core
Bobbin
Ee Series and Other
Frequency
50/60Hz
Price Favorable
Factory Direct Price and Delivery Quickly
Color
Customized
Insulation Class
UL Class B, F, H, N. (Optional)
Input Voltage
Customized
Work Cycle
Customized, Such as ED 80%
OEM
Accept
Transport Package
Carton/ Foam
Specification
6pcs/box
Trademark
AL
Origin
China
HS Code
85043190
Production Capacity
5000PCS/15days

Product Description

Product Description

1. Features

-Conform to EN61558-1, EN61558-2-6, UL1446

-Extremly low stray-magnetic-field

-Efficient reduction of costs and energy

-Temperature rise is below 60°

-Temperature fuse (130°) integrated in primary winding 

2. Technical Parameters

Power Size                              Customized
Primary Voltage                       110/115/120/220/230/240V AC
Secondary Voltage                  24-0-24V AC
Working Frequency                  50/60 Hz
Thermal Switch                        130° (Automatically Reset)
Insulation Class                        B Class (130°)
Pri-Sec Isolation                       4KV
Max Temperature                     60°
 

3. Production Lead Time:

Item/Lead Time Samples Mass Production
Components 1-2 days 5-10 days
SMT 1-2 days 5-10 days
Delivery 3-5 days 5-20 days

4. Toroidal transformer Operating environment: 

1)Temp.:The ambient temperature can not over +40°C.
2)Altitude: Mounting location can not exceed the altitude of 2000m
3)Relative humidity: Maximum 90%
4)The site not attack by rain and snow
5)The medium which no explosion danger, no corroding metal, no electrical breakdown



Industry Control Electrical Power Toroidal Transformer



Packaging & Shipping

Industry Control Electrical Power Toroidal Transformer


Industry Control Electrical Power Toroidal Transformer



Our services 

1.One-stop service covering hardware design + software program + PCB layout + PCB assembly + casing service for customers.
2.More than 20-year experiences with PCB,PCBA production in automatic,auto,medical,industrial control,security,communications,power supply filed.We help our customers to deal with their difficulties in the production and cost down by sourcing from China.
3.We provide full BOM sourcing for all kinds of electronic.parts,connectors,plastic mold and cable,etc. We have most professional component sourcing team and competitive sourcing channels with guarantee quality.
4.Instant feedback and short delivery time.We provide 24-hour online service for global customers.We quote BOM within 24 hours and PCB assembly prototype in 5 days.
5.Both prototype and mass production are acceptable.There is no minimum order quantity restrictions.
6.We test both PCB and key components 100% before delivery.Our warranty is 12 months for all the boards and products.
7.We provide credit to our long-term cooperation customers.

Advantage

Why choose transformer manufacturers?

1. Low weight

2. Low no-load loss

3. Low stray magnetic field

4. Low operating temperature

5. Efficient

6. Cost savings

FAQ

Q1. Can you according to I provide you drawings and parameters production?
Answer: Yes, we can according your requirements to custom.
Q2. What is your MOQ?
Answer: no MOQ requirement.
Q3. Can I make a small order test first?
Answer: Yes, but does not include freight and tax.
Q4. How long is it from the beginning to the end?
Answer: 3 days out of the sample, received the full payment within 7 days of delivery.
Q5. Can you send the sample before we order it?
Answer:Yes, we can Sample fee and freight paid by the buyer, after the batch can be returned.
Q6. What is the sample express you send ?
Answer:DHL, UPS, FEDX failure for 7-15 days. If you have specific requirements can also be .
Q7. What is the payment method?
 Answer:PayPal, credit card, Western Union Bank,
Q8. Has your product been tested before shipment?
Answer:we will have 12 hours of aging test before delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now